Noble Bidding
Electrical

Low Voltage Estimating

Cabling, security, access control and AV, taken off to the drop and priced.

Overview

About low voltage estimating

Low voltage scope hides in the details: drop counts, cable pathways, rack elevations, head-end gear. We take it off system by system so the bid reflects the real material and the real labor to pull, terminate and test it.

From a single security package to a full structured-cabling build, you get organized quantities, current pricing and labor tuned to your crews. Nothing scaled by rule of thumb.

What's included

  • Device and drop counts by system
  • Cable, pathway and termination quantities
  • Rack, head-end and equipment takeoff
  • Labor for pull, terminate and test
  • Current pricing on cable, connectors and gear
  • Color-coded plans and editable estimate sheet
How it works

Our process

  1. 01

    Scope the systems

    We identify each low voltage system in the drawings and specs.

  2. 02

    Count drops and pathways

    Devices, cable runs, terminations and racks quantified by system.

  3. 03

    Price and load labor

    Materials priced live, labor applied for pull, terminate and test.

  4. 04

    Deliver

    Organized, editable estimate with markups inside the agreed window.

FAQ

Common questions

Structured cabling, access control, video surveillance, intrusion, audio-visual, paging and nurse call, among others. Tell us the systems and we confirm scope.

Related services

Need a low voltage estimating estimate?

Get a complete, bid-ready estimate back in 24 to 48 hours. No retainer, no minimum.